EPG was awarded with “well-known product of Zhejiang Province” and “renowned model of Zhejiang Province”. EPG will constantly adhere to it organization spirit of getting practical, progressive, effective and outstanding to make the prime worldwide transmission push. Meanwhile, our items are manufactured in accordance to substantial good quality expectations, and complying with the intercontinental innovative common requirements. EPTT Solitary Span Plastic Movie Greenhouse for Bouquets/EPTto
one Description
EPTT material: Top lined with twelve-15 wire Po movie. coated with Po film .
Span: 6.4/8./9.6m
Eaves top: two.2-six.0m
Intercolmunation :four.0m
Prime EPT:EPTT window ventlation window.
Facet window rack valgus window,sliding window, electric vertical sliding window shutter.
Supporting faXiHu (West EPT) Dis.Hu (West EPT) Dis.ties:According to the greenhouse operate wants to pick distinct equipment.
2. Technical specs
Span | 9.6m, 10.8m, twelve.0m or EPT, as essential |
Size | In accordance to Customer’s prerequisite |
Column room | 4m |
Gutter top | 3-6m |
Planting hanging load | .15kn/m2 |
Wind load | .45 kn/m2 |
Snow load | .35 kn/m2 |
Rainfall | 140mm3/h |
SkeEPTTn EPT | Hot galvanized steel pipe |
EPTTing material | PO/PE/PP Film, Thickness .12mm/.15mm/.20mm |
Type | Tunnel / Arch Greenhouse |
Layer | One |
3 Supporting faXiHu (West EPT) Dis.Hu (West EPT) Dis.ties: Decide on distinct equipments in accordance to the greenhouse purpose.
one | Exterior shading method | Sunshade internet has diverse light EPTT |
2 | Inner warming system | Put in a slender movie inside the greenhouse. it can maintain heat. |
three | cooling technique | Cooling followers and cooling pad |
4 | EPT system | one. EPTT warming: EPT and drinking water warming blower. The EPT variety has gasoline EPT, coal EPT, oil EPT and bio gas EPT, and fuel/oil EPT. 2. Electric warming: only has electric warming blower |
five | EPT method | Prime amp facet window |
6 | Irrigation and ferEPTTzation technique | drip irrigation or spray irrigation |
7 | LigEPTT compensating technique | EPT – force sodium lamp, or LED lamp |
eight | Seedling bed method | Utilised for seeding |
eight | Soilless tradition | Hydroponic, nutrient, and many others… |
9 | EPTT distribution method | manage cupboard |
ten | Other products | We can provide other EPTTing content. |
four.Our Greenhouse Attribute:
SkeEPTTn EPT | sizzling dip galvanized steel This kind of EPTT taken care of steel has great anticorrosion and antirust effects, which extends the service daily life of the greenhouse. EPT created structure and add-ons make sure the outstXiHu (West EPT) Dis.Hu (West EPT) Dis. overall performance of the greenhouse. |
masking content | With the much more than eighty% ligEPTT EPTT and lower EPT, the PE is one particular of the ideal substance to be broadly utilised in the greenhouse. |
service | We can offer 1 quit service for the customer from creating, production, to tests, set up. All the greenhouse can be fabricated EPT in accordance to customers’ need and will be specialist guidance in accordance to our expertise. |
5 The greenhouse application
one) EPTTing vegetable, for instance, tomato, cucumber, pepper, EPTT, leaf vegetable, and so on.
two) EPTTing flower
3) EPTTing fruits
four) soilless lifestyle
five) EPT trial
six) as restaurant
seven) for sightseeing
…
six Our company, our group.
Expert R ampD cEPTTr promise prime top quality and EPTd trustworthy design for each and every project.
Our workship and process
7EPTT and Delivery
eight FAQ
1) How EPTT is the shipping and delivery time?
In accordance to your greenhouse dimensions and method, the supply item is usually ten-60days.
2) Are you investing firm or producer?
We are factory and we have our international trade Dpt.
three) How EPTT is the guarantee time period?
Various elements have diffierent warranty, EPTT, the warranty interval of stXiHu (West EPT) Dis.Hu (West EPT) Dis.rds skeEPTTn is over 15years, sunshade net 2-3years and many others.
four) How to install the greenhouse?Do you source set up services?
We will give paper or video creating handbook or if essential we will send out engineer to give direction.
five) What is the payment expression?
Generally the deposit is thirty-fifty% of whole price, before loading, all the balance need to be paid off.